Cardiff by the Sea House Interior

This 2-bedroom 2-bath house was going through a complete renovation. Antonio’s demolition crew removed ceilings popcorn and other unwanted items. Meanwhile the electrician crew did extensive re-wiring that caused severe damage to walls and ceilings.

We fixed the walls and ceilings. The whole house was re-textured in orange peel and primed. Ceilings were primed twice due to old drywall yellow stains and sprayed twice pure white paint in flat sheen.

The owners picked sky blue color in eggshell sheen for bedrooms and a very light gray for other walls to be painted. After painting the ceilings and walls, there were several more drywall cuts made by electricians that needed repair and texture. Despite delays in delivering and installing doors and cabinets, we did our best in beautifying this house.

Thank you Mark and Ami.

Living Room

Before

During Electrical Work

Insulation

During Drywall Work

After

Fireplace

Before

During

After

Front Door

Before

During – Primed

After

Open Wall

Before

During – Demolition

During Drywall Repairs

After

Kitchen

Before

During – Drywall Cuts

During Drywall Repairs

After

After

After

After

Master Bedroom

Before Facing Closet

After Facing Closet

Before Facing Bathroom

During Demolition

During Drywall Work

After View Bathroom

Before – Attic Access

After – Attic Access

Master Bathroom

Before

During Demolition

During Drywall

After

Stairs

Before

During

After